Development
Geology
2,400 – 2,780 FT
Our geologists can help you in exploration, planning, development, and operations.
That means log correlation across the section, structure and isopach mapping tied to well control, and target selection you can hand to a drilling engineer without a second round of interpretation. Landing depth, azimuth, and the hazards above the target get called before the rig moves, not after.
Well proposals come out with a prognosis, an offset justification, and the pick set they were built on, so the next geologist on the asset can audit the reasoning.
Interval thickness 380 ft / interbedded